deafeningdecibel.com deafeningdecibel.com
   Index Page :> About Us :> Privacy Policy :> Terms & Conditions :> Place Your Link :> Add Your Article
Search:   
Get Free Links
 
   

Home Family & Garden

   

Software & Networking

   

Drink & Food

   

Business & Commerce

   

Children

   

Automobile & Automotive

   

Recreation & Entertainment

   

Law & Politics

   

Finance & Investment

   

Self Enhancement

   

Games & Play

   

Research & Science

   

Relationship & Lifestyle

   

Online Shopping

   

Travel & Accommodation

   

Employment & Careers

   

Art & Culture

   

Medical Care

   

People & Communities

   

Estate & Realty

   

Academics & Education

   

Sports

   

Health & Hygiene

   

News & Media

 

Index Page » Home Family & Garden » House Improvement
 

Garage Door Rough Openings

 

One of the most confusing aspects of homebuilding can be the rough opening for an overhead garage door. It is one of the most frequent questions I am asked.

The rough opening for a garage door, simply put, is the actual size of the door itself. For example, if the garage door is a 7'0" x 16'0", then that is the size the rough opening should be framed to. This is also what the opening in the foundation should be. The studs and cripples will then stop right at the edge of the foundation.

The foundation usually drops 8" to allow the concrete floor to be poured over the top of it. This has to be accounted for when figuring the length of the cripples to get the right height of the overhead door header. Normally the floor is poured 3" below the top of the foundation wall. If the overhead door is 7' then 4 and 1/2" is subtracted from that height. This is the 3" drop and 1 1/2" for the bottom plate. Your total cripple length would be 6' 7 1/2".

Once the floor is poured, the door jambs can be installed. The width of these jamb pieces vary with the size of the wall and what the wall is finished with (brick, siding, dryvit, etc). The header piece is installed first, then the two side pieces. These go from the header to the finished concrete floor. Once the jambs are in the door can be installed. With the door installed the door stops are then put on either with or without weatherstripping.

If you know the door size of your overhead door, you know the rough opening. From there its determining where to start and stop your framing.

(c) Mike Merisko www.sawkerfs.com

Author: Mike Merisko
 
Author Bio:
Mike Merisko is a proclaimed scripter. Mike likes to write articles about this topic.
This article can be searched using: lowes home improvement, home improvement loan, home improvement products, home improvement stores
 
 
 

Related Articles

 
The Garden Gnomes
 
10 Holiday Traditions To Share With Your Family
 
Romantic Decor Extends to the Bathroom
 
History Of The Strawberry And The Strawberry Tree
 
Do You Know The Origins of Christmas Traditions ?
 
Always Beware of that Latex Glove!
 
A New School Year
 
Pregnancy and the Use of Aromatherapy
 
You Are Never Too OLD
 
Colostrum Milk
 
 
 
Index Page :> Privacy Policy :> Terms & Conditions  
© 2006-2008 www.deafeningdecibel.com All Rights Reserved Worldwide.